Intel · 2025
Intel Core Ultra 5 225T
The Intel Core Ultra 5 225T is a 10-core desktop processor based on the Arrow Lake microarchitecture, released in 2025.
The Intel Core Ultra 5 225T is a desktop processor built on the Arrow Lake microarchitecture and manufactured on a 3 nm process node. It features 10 cores (6 performance cores and 4 efficient cores) with 10 threads, a base clock of 2.5 GHz, and a boost clock of 4.9 GHz. The processor includes 22 MB of L2 cache and 20 MB of L3 cache. It has a base power of 35 W and a maximum turbo power of 114 W. The CPU supports up to DDR5 6400 MT/s memory across two channels and does not support ECC memory. It integrates Intel Graphics and provides 24 PCIe lanes (PCIe 5.0 and 4.0). The processor uses the FCLGA1851 socket and is not unlocked for overclocking. It was released on January 1, 2025, with a launch MSRP of 236 USD.
Specifications
| Microarchitecture unverified | Arrow Lake |
|---|---|
| Cores | 10 |
| P-cores | 6 |
| E-cores | 4 |
| Threads | 10 |
| Base clock | 2.5 GHz |
| Boost clock | 4.9 GHz |
| L2 cache (total) | 22 MB |
| L3 cache | 20 MB |
| Process node | 3 nm |
| TDP / base power | 35 W |
| Max turbo power | 114 W |
| Socket | FCLGA1851 |
| Memory support | Up to DDR5 6400 MT/s |
| Memory channels | 2 |
| ECC memory support | No |
| Integrated graphics | Intel® Graphics |
| PCIe lanes (CPU) | 24 |
| PCIe version | 5.0 and 4.0 |
| Instruction sets | Intel® SSE4.1, Intel® SSE4.2, Intel® AVX2 |
| Unlocked multiplier | No |
| Release date | 2025-01-01 |
| Release year | 2025 |
| Launch MSRP | 236 USD |